Suite A ~ Upstairs

All of the light fixtures were replaced. The linoleum in the bathroom was replaced with tile. Grey laminate was installed though out the rest of the first floor. The entire space was repainted and the trim was replaced. A new commercial grade water heater was installed.

Main Living Area

The stairs to the basement were removed, making room for a dining table. The back door was replaced.

Before

5-1U Before Upstairs Railing Pana Left S

After

5-2U Reno Upstairs Railing P1050561.JPG

Replaced countertop and range hood. Added tile backsplash and a dishwasher

Before

6-1U Before Upstairs Kitchen Pana Right

After

6-1U Reno Kitchen P1050556.JPG

The wall between the kitchen and living room was removed

Before

8U Before Upstairs Wall IMG_0074.JPG

After

P1050621.JPG

The front door was replaced. A light fixture was added and new blinds were hung.

Before

9-1U Before Upstairs Front Room IMG_0070

After

9-2U Reno Front Room P1050549.JPG

Master Bedroom

Replaced the window                Vent opening resized

Before

14U Before Master IMG_0036.JPG

After

14U Reno Master P1050569.JPG

Closet

Bigger opening                         Added a light

Before

15U Before Master Closet 2IMG_0083.JPG

After

16U Reno Master Closet P1050570.JPG

Spare Bedroom

The existing closet is where a new furnace and duct work was installed so Suite A would have independent heat and a new closet was added.

Before

17U Before Spare Closet IMG_0089.JPG

After

17U Reno Spare Closet P1050598.JPG

Bathroom & Laundry

Replaced the vanity, mirror and finishes

Before

12U Before Vanity Bathroom2IMG_0097.JPG

Replaced tile surround and bathtub

Replaced hardware

Before

13U Before Bathroom Tub IMG_0103.JPG

After

12U Reno Vanity Bathroom IMG_8040.JPG

After

P1050582.JPG

The opening left from the chimney is where a washer and dryer were added.

Before

IMG_8033.JPG

After

10U Washer & Dryer P1050616.JPG