top of page

Suite B ~ Downstairs

The basement had to be completely gutted. From there we were able to reconfigure the layout to make the most of the space. All new water lines to meter, all new sewer lines from the footings in and back up valve. New furnace and duct work. A new commercial grade water heater was installed. Dry core was installed with new laminate throughout. Fire & sound rated insulation in the ceiling.

Separate Entrance & Laundry

An addition makes room for a separate entrance and room for a washer and dryer. The space under the stairs was left accessible to use for storage.

Before

IMG_8072.JPG

Before

IMG_8515.JPG

Before

IMG_8513.JPG

Before

IMG_8514.JPG

After

2B Reno Washe & Dryer IMG_8562.JPG

After

1B Reno Stairs IMG_9493.JPG

Kitchen

The kitchen is open to the dining room and living room.

Before

4B Before Kitchen.JPG

After

6B Reno Kitchen IMG_8543.jpg

After

5B Reno Kitchen IMG_8541.jpg

After

4B Reno Kitchen IMG_8534.jpg

Living Room

Before

3B Before Front Room IMG_0129.JPG

After

3B Reno Front Room IMG_9486..JPG

Master Bedroom

A walk-in closet was added

Before

10B Before Master IMG_0153.JPG

Before

IMG_7903.JPG

After

10B Reno Master IMG_8551.jpg

After

11B Reono Master Closet MG_8554.jpg

Spare Bedroom

Before

12B Before Spare Bedroom IMG_0156.JPG

After

12B Reno Spare Bedroom IMG_8561.jpg

Before

IMG_7901.JPG

After

13B Reno Spare Bedroom Closet IMG_8549.J

Before

Bathroom

After

8B Before Vanity Bathroom IMG_ 1.JPG
8B Reno Bathroom Vanity IMG_9489.JPG

Before

9B Before Shower IMG_0141.JPG

After

9B Reno Shower IMG_8556.jpg

© 2017 by Big Knife Construction. Proudly created with Wix.com

bottom of page